|
|
Thanks to the application of several Spirotech products, it is now possible to go skiing in Dubai. Because the cooling system is so vital, the designers aim was to build a highly controllable and reliable installation with low or no maintenance. They therefore chose Spirotech for the deaeration and dirt separation.
|
|
|
After a successful trial, First Choice Homes from Oldham decided to equip each and every new or replaced boiler with a Spirovent.
Senior Technical Officer Mr. S.A. Ratcliffe BA:
|
|
|
The heating installation of office complex "Randwyck" in Maastricht (NL) services 4 office blocks with numerous offices and public rooms. Because of the piping, with many horizontal, staggered piping and induction ceilings, the systems are difficult to vent. During the start-up period of 6 weeks, over 1.000 L. of air was removed from the system. This resulted not only in an optimal deaerated system, but also enhanced a quick and easy commissioning.
|
|
More references are prepared for publication
|